The Top 10 Questions About Charging Infrastructure for Truck Depots

As electric trucks become more prevalent in logistics and freight operations, fleet operators are turning their attention to a critical component of electrification—charging infrastructure. Unlike passenger EVs, commercial trucks demand higher power, greater efficiency, and a well-thought-out installation strategy. In this blog, we’ll address the top 10 most common questions businesses ask when considering charging infrastructure for truck depots.

1. Why Is Charging Infrastructure Important for Truck Depots?

Charging infrastructure is the backbone of an electrified truck fleet. Without a dependable, efficient, and scalable setup, even the best electric trucks won’t deliver operational value. Charging at the depot ensures vehicles are ready when needed and minimizes reliance on public charging, which may not meet power or compatibility needs.

2. What Types of Chargers Are Suitable for Electric Trucks?

The most suitable chargers for electric trucks are DC fast chargers with high power output, typically ranging from 150kW to 350kW. For heavy-duty fleets, megawatt charging systems (MCS) are emerging as a future standard. AC chargers may be used for light-duty electric trucks, but for long-haul applications, high-speed DC charging is essential.

electric-truck charging infrastructure

3. How Much Power Is Needed for a Truck Depot?

Power needs depend on the number of trucks, their battery capacity, charging frequency, and dwell time. A medium-sized depot with 20 electric trucks might require 1–2 MW of peak power. Utility coordination is crucial to assess grid capacity and whether on-site energy storage or renewables (like solar PV) are needed to supplement the load.

4. What Are the Site Requirements for Installing Chargers?

Successful installation requires adequate space, electrical infrastructure, permitting, and accessibility. Site evaluation should consider:

  • Vehicle turning radius
  • Parking alignment
  • Cable management systems
  • Proximity to the power supply

Working with experienced EPCs (engineering, procurement, construction firms) ensures efficient layout planning.

5. How Long Does It Take to Charge a Commercial Truck?

Charging time varies based on charger power and battery size. A 300kWh battery with a 150kW charger takes roughly 2 hours to charge from 0–100%. With a 350kW charger, it can drop below 1 hour. Partial or opportunity charging strategies can further reduce downtime by integrating short top-ups throughout the day.

DC Fast Charging Solutions

6. How Can I Ensure Reliable Power Supply at My Depot?

Reliability can be enhanced through:

Redundancy planning ensures operations continue even during grid outages or fluctuations.

7. What Are the Costs Involved in Setting Up Truck Charging Infrastructure?

Costs vary based on location, scale, and technical requirements, but typically include:

  • Hardware (chargers, transformers, cabling)
  • Civil and electrical works
  • Grid connection fees
  • Software and management systems
  • Optional BESS or solar installation

Estimates range from $50,000 to $200,000 per charging point. However, total cost of ownership (TCO) improves over time due to lower fuel and maintenance costs.

8. How Do I Optimize Charger Utilization and Fleet Scheduling?

Fleet operators can install smart charging software that monitors:

  • Charger availability
  • Truck state of charge (SOC)
  • Peak energy rates

By prioritizing charging based on departure times and vehicle needs, depots can minimize idle time and electricity costs. Integration with telematics systems provides even deeper insights.

charging heavy duty

9. Are There Any Government Incentives or Grants Available?

Yes. Many countries offer:

  • Tax credits
  • Grants for infrastructure development
  • Utility rebate programs

In the U.S., programs like CALeVIP in California or NEVI funding under the IIJA help reduce upfront costs. Europe and Southeast Asia have similar programs tailored to commercial electrification. Always check regional or federal programs applicable to your site.

10. What Maintenance and Support Are Required After Installation?

Maintenance includes:

  • Regular charger inspection and testing
  • Software updates
  • Replacing wear items (e.g., connectors, cables)

It’s advisable to have a service agreement with the charger provider or a third-party maintenance team. Remote monitoring and diagnostics can catch issues before they impact operations.

High-Power Charging stations

Conclusion: Planning Now for a Scalable, Future-Proof Depot

Building truck charging infrastructure is a strategic investment that goes beyond just installing hardware. It involves long-term planning, grid coordination, and smart energy management. By addressing these top 10 questions, fleet managers can better prepare for the shift to zero-emission logistics while maximizing uptime and ROI.

Whether you’re just starting to explore electrification or scaling up a fleet of electric trucks, the right electric trucks charging station is key to operational success.

Our Social

Facebook: www.facebook.com/sinoevc

Instagram: www.instagram.com/sinoevc

Linkedin: www.linkedin.com/company/sinoevse

Youtube: www.youtube.com/@sinoevc

Twitter: www.twitter.com/sinoevc

“Charging for A Better Life”

www.sinoevse.com

—Zhuhai Sino Energy Technology Co.,Ltd.

Related Posts

Ready to Shape Your Business Case With Sino Energy?

As a leading EV charger manufacturer in China, Sino Energy provides suitable electric vehicle charger products and offers OEM, ODM, and SKD services

to transform your project into a tailored application case for your brand.